L’Energètica installs solar panels in Artés for public energy generation

The installations at Institut Miquel Bosch i Jover will also supply energy to the Artés CAP, generating 148,750 kWh annually.

Generic image of solar panels installed on the rooftop of a public building in Catalunya, with a blue sky and Mediterranean architecture.
AI

Generic image of solar panels installed on the rooftop of a public building in Catalunya, with a blue sky and Mediterranean architecture.

L’Energètica, the public company of the Generalitat, has installed photovoltaic panels at the Institut Miquel Bosch i Jover in Artés to generate public, local solar energy, which will also serve the local health center (CAP).

L’Energètica, the public energy company of the Generalitat de Catalunya, has commissioned six collective self-consumption systems in central Catalunya, including Artés, Manresa, Sant Fruitós del Bages, Santpedor, Bagà, and Moià. These initiatives, co-financed by the European Regional Development Fund (ERDF) Programme of Catalunya 2021-2027, allow for the sharing of green energy generated on public rooftops with other nearby Generalitat facilities.
In Artés, the solar panels have been installed on the rooftop of the Institut Miquel Bosch i Jover and are estimated to generate approximately 148,750 kWh annually. Thanks to the collective self-consumption model, energy not consumed by the institute is sent to the Artés Primary Care Center (CAP) without tolls or charges. The institute utilizes 57% of the generated energy, with the remainder transferred to the CAP.
These installations are part of the progressive rollout of collective self-consumption systems that L’Energètica is implementing throughout Catalunya. The system helps save costs and reduce losses by coordinating buildings with surplus energy, such as institutes, with those that have a deficit, like Primary Care Centers.
L’Energètica's mission is to multiply renewable energy generation to supply the public services of the Catalan administration. With a target for 2040, the company aims to manage a generation capacity of at least 1,000 MW, ensuring clean, local, and stable-priced energy for citizens through its public services.
Based on information from the official source: Ajuntament de Artés (16/10/2026)