The works, which form part of the final phase of the Baix Camp avenue project, include road paving, the adaptation of the old bridge for vehicle and pedestrian traffic, and the final gardening works. These interventions will complete the renovation of the town's access, turning it into a tree-lined promenade with a central pedestrian island.
Cambrils mayor, Oliver Klein, has highlighted that the city needed this work and has assured that both residents and users of the main access will benefit. «It will make a big change along the entire route and will be much more welcoming», the councillor stated, recalling that this section was the last to retain the fast-track configuration, physically separating the Eixample and Pallissa neighbourhoods.
“"Cambrils needed this work. The neighbourhood that passes through the avenue every day will benefit, as will those arriving in Cambrils via this entrance."
The mobility unit of the Local Police has already signposted the alternative routes for circulation during the works. The proposed routes are: Esport Avenue-Charles Darwin-Albert Promenade-la Salle Promenade; Moragues i Barret Street-Independence-Mil·lenari Avenue; and N340-Camí de les Lloses-Estel-José San Martín-Josep Iglesies.
The works, awarded for a total of 1.3 million euros, aim to integrate the old highway into the urban fabric, following the promenade section already executed in other sections.




