Preliminary works begin for the Ridaura footbridge in Platja d'Aro

The works follow the style of the Maritime Promenade and include the naturalization of riverbanks before the footbridge installation.

Generic image of construction work in a river area with vegetation.
AI

Generic image of construction work in a river area with vegetation.

The Town Council of Castell d'Aro, Platja d'Aro i s'Agaró has initiated preliminary works for the construction of the Ridaura footbridge, which will connect both banks of the river in Platja d'Aro.

The works are part of the comprehensive transformation of the Platja d'Aro Maritime Promenade. This new phase will follow the naturalized style that was launched in the spring of this year at the southern end of the promenade, characterized by sandy paths, dune separation from the beach area, native vegetation, and resting areas.
The current works focus on the two banks of the Ridaura river, before proceeding with the installation of the footbridge. This new structure will be 72 meters long and 3.5 meters wide, and will be notable for having no pillars.
Based on information from the official source: Ajuntament de Castell d'Aro, Platja d'Aro i s'Agaró (23/11/2026)