This week, Terrassa will experience two significant traffic diversions due to ongoing works, impacting both public transport and general citizen mobility. The disruptions will be concentrated on Mas Adei street, Sant Antoni street, and the BRCat-N150a corridor connecting Terrassa with Sabadell.
On one hand, asphalting tasks on Mas Adei street will lead to its closure to traffic from July 20th to August 21st. Concurrently, due to works on the facade of the Mútua Terrassa building, Sant Antoni street will be closed on Sunday, July 19th, between Plaça del Doctor Robert and Sant Cristòfol street.
These works on Sant Antoni street will affect several urban public transport lines: L1 (towards Hospital), L3 (towards la Maurina), L6 and L7 (towards Pla del Bon Aire), and L10 (towards Estació del Nord). The Creu Gran stop will be cancelled, and buses will be rerouted via Jacquard Avenue, Prat de la Riba street, and Vint-i-Dos de Juliol promenade.
On the other hand, between July 20th and 24th, asphalting works will be carried out on the N-150a, as part of the BRCat – N150a Terrassa-Sabadell corridor project. Although traffic will not be continuously closed, occasional disruptions and temporary restrictions are expected. Alternative routes will be provided, and access to residences in the area will be ensured through specific signage, including access via Pedra Blanca street.




