Technical reports prepared on November 2nd place the initial cost of the most urgent actions, including VAT, at 341,918.55 euros. The City Council is already working to secure funding through the emergency municipal aid program from the Barcelona Provincial Council, and support will also be requested from the Generalitat and other competent administrations.
Landslides affected four streets in three developments: Carrer del Pebràs (Canadà Parc), Carrers de Sant Marçal and del Turó de l’Home (La Baronia del Montseny), and Carrer del Pi (Collsacreu). These landslides compromised the stability of the slopes, affecting traffic and access to plots. Slope stabilization and street repairs account for the largest portion of the expense, estimated at 246,240 euros. Meanwhile, risk areas will be signposted and delimited, and slopes will be monitored.
The force of the water caused obstructions in the Can Palomer stream, the Can Bonamusa stream, and a section of the Canadà Parc stream. Additionally, a stream in La Baronia del Montseny overflowed, eroding the land supporting a collector. In Riu Sec, soil collapses occurred near homes, and stone blocks fell in the Can Vilar stream near sports facilities. Urgent actions for streams and green areas are valued at 70,832 euros.
The flooding of El Casal, the municipal facility, primarily affected the kitchen due to the roof's drainage system. Damage occurred to the false ceiling, electrical installation, and some equipment. The kitchen's electrical system has been repaired, and downspouts have been temporarily rerouted. Repairs to the false ceiling and improvements to the roof's water collection and evacuation system are pending. The total cost of actions at El Casal is estimated at 21,216.55 euros.




