The emergency services were alerted around 9:30 PM after a blast was heard near Basters street. Civil Protection activated the Plaseqta emergency plan for the chemical sector, establishing a 500-meter safety perimeter around the facility.
Ten firefighting units managed to control the blaze within an hour. No injuries were reported, and the company's internal fire suppression systems were effective in containing the fire inside the factory.




