The measure will allow for an increase from 185 kW to 550 kW and includes the installation of a new measurement center and a new 25 kV underground line. This new infrastructure will connect to a customer transformer station (CT-1) located within the campsite, in area S.U.P. 018 0002.
Power upgrade at Platja Cambrils campsite
The Cambrils City Council has provisionally authorized land use to increase electrical power and install a new measurement center.
By Pere Roca Soler
••1 min read
AI
Electrical installation with equipment and cables.
The Cambrils City Council has provisionally authorized land use for an electrical power upgrade at the Platja Cambrils campsite.
Based on information from the official source: Ajuntament de Cambrils (30/09/2026)



