The new contract, aimed at improving the reliability and availability of these infrastructures, includes a 33.5% increase in the annual budget compared to the previous one, reaching 3,082,388.30 euros (VAT included). This rise is due to the expansion of the inventory, updated unit prices, intensified preventive maintenance, and increased labor and material costs.
The infrastructure inventory grows by 13.6%, from 147 to 167 units. New vertical elevators and six moving walkways are being incorporated, and the number of escalators is increasing. Additionally, six projected escalators and six elevators could be added to the contract, potentially increasing the inventory by up to 21.8%.
A key innovation is the reinforcement of preventive and predictive maintenance, including a second monthly maintenance for inclined elevators and more efficient planning of interventions. The contract also expands the components covered in long-cycle maintenance for the planned replacement or modernization of key elements.
The contract has been divided into two lots to promote technical specialization: one for elevator maintenance and another for escalators and moving walkways. Each lot will have its own service manager and control center to enhance coordination and monitoring.
These infrastructures are essential for facilitating daily travel, particularly in hilly neighborhoods. The new contract aims to improve facility reliability, reduce service interruptions, and meet the needs of residents who use these facilities.