Verdaguer station, on line L4, will remain closed between July 6 and August 30 to renovate the lobby. During this period, trains will not stop at this station, although line L5 will continue to operate normally. As an alternative, Transports Metropolitans de Barcelona recommends using Girona or Joanic stations, or using line L5 to reach nearby points such as Sagrada Família or passeig de Gràcia.
In addition, the connecting corridor between L4 and L5 at Verdaguer will remain closed, forcing users to transfer via the street on Provença street. At the same time, the Catalunya interchange will close the corridor between lines L1 and L3 for two months starting July 6 to remove asbestos and renovate the facilities.
Other disruptions include line L9/L10 Nord, where the section between la Sagrera and Onze de Setembre will be closed from June 25 to August 30, with an extension to Bon Pastor in September. Finally, line L1 will undergo a significant closure between plaça de Sants and Florida from July 17 to August 28 to renew the tracks.




