Campdevànol begins asbestos removal from Sala Diagonal roof

Work will start on November 16th, and residents in the area are asked for their cooperation and caution.

Generic image of asbestos cement sheets being removed by workers in protective gear.
AI

Generic image of asbestos cement sheets being removed by workers in protective gear.

The Campdevànol City Council will begin work on Monday, November 16th, 2026, to remove the asbestos cement roof of the Sala Diagonal, located at Carrer Diagonal, number 6.

The operation will be carried out by a specialized and authorized company, in accordance with current safety and health regulations, and applying the necessary preventive measures to ensure the correct execution of the work.
Due to this intervention, the City Council requests the cooperation of nearby residents and reminds them of the importance of following safety instructions during the execution period, such as respecting signage, not accessing restricted areas, and keeping openings facing the work zone closed.
It is recommended to avoid staying in courtyards, terraces, or outdoor spaces near the work area during the removal operations, as well as avoiding hanging clothes or leaving dust-sensitive objects outdoors. It is also requested to avoid unnecessary transit or lingering in the vicinity of the work zone.
The contracted company will apply specific protocols for the control, wetting, dismantling, packaging, removal, and authorized disposal of asbestos-containing waste, in accordance with the relevant regulations.
For any inquiries or to report an incident, residents can contact the person in charge of the operation at ELECTRICITAT BOQUET, S.L., via email at boquet@boquet.cat.
The City Council thanks residents in advance for their understanding and cooperation regarding this action, which will be carried out with all established safety and prevention measures.
Based on information from the official source: Ajuntament de Campdevànol (11/11/2026)