The decision follows a report from the Catalan Water Agency (ACA) warning that the selected site is located in a preferential flow zone of the Tossa stream, posing a potential flood risk.
Following this setback, local authorities are studying the relocation of the facility to the Mas Font sector, specifically on Joan Maragall Avenue, to ensure the project meets safety regulations.




