Torredembarra Council expands playground in Boronat Square

Works begin on 30 November and will double the play area surface, which will remain closed for fifteen days.

Generic image of an empty children's play area with sand and safety flooring in a Mediterranean square.
AI

Generic image of an empty children's play area with sand and safety flooring in a Mediterranean square.

The Torredembarra Council has announced that works to expand the children's play area in Mossèn Joaquim Boronat Square, specifically in the space near Carrer de la Fàbrica, will begin next Monday, 30 November.

Key points

  • Investment of 10,674.14 euros
  • Surface area increases from 149.68 m2 to 428.16 m2
  • Playground will remain closed
The project costs 10,674.14 euros and is expected to take approximately fifteen days. With this intervention, the area designated for the playground will increase from 149.68 m2 to 428.16 m2.
During the construction period, the playground will remain closed. The Council thanks users for their understanding.
In the medium term, the council also plans to address the renovation of the rest of the square.
Based on information from the official source: Ajuntament de Torredembarra (27/11/2026)