This infrastructure project, costing 700.000 euros, is fully funded by the Barcelona Metropolitan Area (AMB). The bridge will feature ramps and stairs to provide a safer and more direct route for pedestrians and sports facility users near the railway lines.
Construction is scheduled to comply with Adif railway regulations due to its proximity to the tracks. The works are expected to last between four and six months, significantly enhancing the integration of local urban spaces.




