The works, currently underway this week, are expected to be completed by early next week. The project is supported by a grant from the Barcelona Provincial Council.
The work involves removing some of the existing asphalt and laying new material. The streets affected include a section of Carrer Indústria, Carrer Roca d’Embràs, various sections of Carrer Reforma and Carrer Major, and the stretch between the Cemetery and the Santuari de Lurdes.
In addition to repaving, two speed bumps are being installed to reduce vehicle speed. One is located on the Carretera de Sabadell, before the roundabout connecting to the roads to Navàs and Sant Feliu Sasserra, and the other is being installed on Carrer de la Resclosa, near the white buildings, before the bend and the pedestrian crossing.
These works will improve the condition of several streets and introduce measures to reduce speed at two key points in the municipality, with the aim of making vehicle circulation and pedestrian movement safer.




